25+ Years of Experience

Consultancy Projects

Ibn Sina Hospital and Diagnostic Center, Badda

2023-24

◉ Project Name: Ibn Sina Hospital and Diagnostic Center, Badda

◉ Year: 2023 - 2024

◉ Description: 4B+G+17 storied hospital building

◉ Client: Ibn Sina Trust

◉ Role: Checking Foundation and Structural Design

◉ Tasks: Shore Protection Design, Foundation Design and Structural Design

18-Storied Commercial cum Residential Building with one basement

2023-24

◉ Project Name: 18-Storied Commercial cum Residential Building with one basement

◉ Year: 2023 - 2024

◉ Client: Mr. Muhammad Lutfor Rahman, Mymensingh

◉ Role: Checking Foundation and Structural Design

◉ Tasks: Foundation Design and Structural Design

Ibn Sina OSD Building at Godhulia Project, Mauna, Gazipur

2021-23

◉ Project Name: Ibn Sina OSD Building at Godhulia Project, Mauna, Gazipur

◉ Year: 2021 - 2023

◉ Client: Ibn Sina Pharmaceutical Industries Limited

◉ Role: Checking Foundation and Structural Design

◉ Tasks: Foundation Design and Structural Design

Swapnochura 3 (11 storied residential building with one basement)

2021-24

◉ Project Name: Swapnochura 3 (11 storied residential building with one basement)

◉ Year: 2021 - 2024

◉ Client: Army Welfare Trust

◉ Role: Checking Foundation and Structural Design

◉ Tasks: Foundation Design and Structural Design

Dyeing Factory Building, Narshingdi

2022-24

◉ Project Name: Dyeing Factory Building, Narshingdi

◉ Year: 2022 - 2024

◉ Client: Masco Group

◉ Role: Checking Foundation and Structural Design

◉ Tasks: Foundation Design and Structural Design

Development of Risk Sensitive Land Use Planning Practice in Greater Dhaka (URP/RAJUK/S-05)

2019

◉ Project Name: Development of Risk Sensitive Land Use Planning Practice in Greater Dhaka (URP/RAJUK/S-05)

◉ Year: 2019 - 2021

◉ Client: RAJUK

◉ Role: Geotechnical Key Expert (National)

◉ Tasks: Liquefaction Analysis, Amplification Analysis, Quality Control of CPT, SPT, SCP, SDHT, Microtremor, Lab Tests, Bearing Capacity Calculation,

◉ Report Review, Technology Transfer, Training to RAJUK and Stakeholders etc.

4B+G+32-storied ICB Headquarter, Razarbag, Dhaka

2019-21

◉ Project Name: 4B+G+32-storied ICB Headquarter, Razarbag, Dhaka

◉ Year: 2019 - 2021

◉ Client: JPZ Consultants

◉ Role: Foundation design, Braced Excavation Design, Advisory service to structural designer

2B+G+20 Storied Shahabuddin Center and Shahabuddin Medical College, Gazipur

2019

◉ Project Name: 2B+G+20 Storied Shahabuddin Center and Shahabuddin Medical College, Gazipur

◉ Year: 2019

◉ Client: Shahabuddin, CIP

◉ Role: Structural Design, Foundation Design, Shore Pile Design

2B+G+15 Storied Hospital Building for Panacea Medical Services, Dhanmondi

2021

◉ Project Name: 2B+G+15 Storied Hospital Building for Panacea Medical Services, Dhanmondi

◉ Year: 2021

◉ Client: Panacea Medical Services Ltd and Ibn Sina Trust

◉ Role: Checking and Redesign of Structure

Construction of Akhaura-Agartala Dual Gauge Railway Link (Bangladesh Portion) Project

2019

◉ Project Name: Construction of Akhaura-Agartala Dual Gauge Railway Link (Bangladesh Portion)

◉ Year: 2019

◉ Client: Texmaco Rail and Engineering Ltd

◉ Role: design of subsoil treatment under culverts and embankments, Design of PVD spacing and length, Design Sand Compaction Piles

Akhaura-Laksam Dual Gauge Project

2017 - 18

◉ Project Name: Akhaura-Laksam Dual Gauge Project

◉ Year: 2017 - 2018

◉ Client: CTM JV (China Railway Group Limited, Toma Construction & Co. Ltd and Max Infrastructure Limited)

◉ Role: Alternative design of subsoil treatment under culverts, embankments and bridge approaches, Lateral stability analysis of bridge abutments using Geotechnical FEM software, Design of PVD spacing and length, Design Sand Compaction Piles, Design of gabion at embankment sections through pond, slope stability analysis

Dohazari-Cox’s Bazar Rail Line Project (lot-2)

2018-19

◉ Project Name: Dohazari-Cox’s Bazar Rail Line Project (lot-2)

◉ Year: 2018 - 2019

◉ Client: CCECC-Max JV (China Civil Engineering Construction Corporation and Max Infrastructure Limited)

◉ Role: Design of ground treatment under culverts, embankments and bridge approaches based on subsoil investigation done by contractor, Preparation of Geotechnical Interpretative Report, Checking vertical and lateral capacity of piles of all bridges.

Factory Building of Various Companies

2016-17

◉ Project Name: Factory Building of Various Companies

◉ Year: 2016 - 2017

◉ Client: Kenpark, Univogue, Opex

◉ Role: Designing New Buildings and Retrofitting Design of Old Buildings as per BNBC, Alliance, Accord and Levi’s standard

Health System Strengthening For Vaccine Prevention Diseases Surveillance and Effective Vaccine Management (GAVI Programme-HSS2)

2016

◉ Project Name: Health System Strengthening For Vaccine Prevention Diseases Surveillance and Effective Vaccine Management (GAVI Programme-HSS2)

◉ Year: 2016 - 2017

◉ Client: UNICEF - Bangladesh

◉ Role: Project Director on behalf of Environment and Infrastructures Man agement Systems Limited; Supervised Foundation and Structural Design for renovation/extension/new construction of vaccine rooms in more than 32 districts

Capital Dredging of Kornafuly River

2010-13

◉ Project Name: Capital Dredging of Kornafuly River

◉ Year: 2010 - 2013

◉ Client: Chittagong Port Authority (CPA)

◉ Role: Design of Jetty, Bridge Foundations, Embankment, Slope Protection and River Training Works

CEMCOR River Container Terminal, Mukterpur, Munshiganj

2010

◉ Project Name: CEMCOR River Container Terminal, Mukterpur, Munshiganj

◉ Year: 2010

◉ Client: CEMCOR LIMITED (SUMMIT GROUP)

◉ Role: Jetty Design

Repair/ Reconstruction/ Construction of Bridge Works In Sholasahar - Dohazari Section

2015

◉ Project Name: Repair/ Reconstruction/ Construction of Bridge Works In Sholasahar - Dohazari Sectionj

◉ Year: 2015 - 2016

◉ Client: Bangladesh Railway (East)

◉ Role: Designing 5 Steel Bridges (span 47m, 30m, 18m, 18m, 12m) including Foundation

Preliminary Structural Safety Assessment of Existing Garments Factory Buildings

2013

◉ Project Name: Preliminary Structural Safety Assessment of Existing Garments Factory Buildings

◉ Year: 2013 - 2014

◉ Client: International Labor Organization (ILO)

◉ Role: Preliminary Structural and Foundation Safety Assessment based on visual observation and Factor of Safety Calculation of Columns

14-Storied Academic Building of BUP

2010

◉ Project Name: 14-Storied Academic Building of BUP

◉ Year: 2010

◉ Client: Bangladesh University of Professionals (BUP)

◉ Role: Checking foundation and structural design

Gulshan Center Point (3+26 Storied Shopping and Commercial Complex)

2011-13

◉ Project Name: Gulshan Center Point (3+26 Storied Shopping and Commercial Complex)

◉ Year: 2011 - 2013

◉ Client: United City Development Ltd (United Group))

◉ Role: Checking foundation and structural design

Contact with Me

Phone Call

Call Time (09:00 am - 10:00 pm)

THANK YOU . .. ... .... .....